I have a customer that has a 600 amp 3 phase service that he had installed, it is not complete yet. He is all ready feeding 2-200amp panel and 2-150amp panels from the main panel. But he still needs a few more 150amp panels to be feed (actually they are disconnects that are feeding panel but I plan to feed them straight from a main panel).
My question is. With the current scheme could I double lug (with appropriate lugging) from the main cabinet outside, go through CT's and feed a 400amp panel on inside? I am trying to give him more load space without replacing main 600amp panel. Any help is much appreciated.
How far do you have to stub up utility pole for PC?
Thanks