Im a bit stumped here on any extra specific equipment needed for this scenario.
Looking to add a 60kw Kholer to a large residential home with two 200 amp panels. 1 panel has solar/Tesla power walls (3) and gateway and the other panel has solar/ Tesla power wall (2) and another gateway both setup as whole home backup
I would like to add the kholer transfer switches between the Tesla gateway/ats and the home loads. I wasn't sure what else might be needed if one system was still energized by the battery backup and the other panel was off and ready for the generator to take over. Is there even a concern with the generator transfer switches working independently from each other or would I need additional relays? note we are not trying to charge the batteries via generator rather have the generator as an additional backup if the batteries depleted.
Looking to add a 60kw Kholer to a large residential home with two 200 amp panels. 1 panel has solar/Tesla power walls (3) and gateway and the other panel has solar/ Tesla power wall (2) and another gateway both setup as whole home backup
I would like to add the kholer transfer switches between the Tesla gateway/ats and the home loads. I wasn't sure what else might be needed if one system was still energized by the battery backup and the other panel was off and ready for the generator to take over. Is there even a concern with the generator transfer switches working independently from each other or would I need additional relays? note we are not trying to charge the batteries via generator rather have the generator as an additional backup if the batteries depleted.