Does 680.25 (a) and its exception,typically mean that if you have enough foresight to install a subpanel for a pool before the pool gets there you can put it in romex,but if the subpanel must be installed later because you are getting a pool the wiring must be installed in one of the acceptable raceways and romex cannot be used?
	
		
			
		
		
	
				
			
				