I have a new service at 200-amps with a 200-amp MCB. In order to install a larger PV system, I want to install a 175-amp MCB. The calculated loads in the building are less than 175-amps.
Question: Can I install the service feeder to be rated at 175-amps as well instead of the 200-amps? Or does the service need to remain at 200-amps because of the bussing in the main board?
It's not a lot of money but it could be if the service were much larger and it was a long run to the utility transformer.