Have any of you had to deal with installing additional wire in a cable tray that already has power cables, (440v, 3 phase) in the tray? I have been told that 70E will not allow a worker to be in the cable tray while the power cables are energized. A good deal of our tray cannot be accessed by ladder or bucket truck and the only way to pull the cable is to be inside the existing tray. I was unable to find this covered in the 70E book, but I may have missed it, can anyone shed some light on this issue?
thanks
thanks