I have been brought in after a pool cover has been installed and I am telling the contractor we need to bond in-between the aluminum track sections.
I have only done one other pool and we were able to bond the tracks and hide the bond lugs in embedded concrete.
In this case there is no way to hide them that I can see, and they'd be a hazard if they were on top(tripping hazard). Any ideas from people who have done more of these than I? Theoretically the rail sections should be self bonding but I am not sure the inspector will see it that way.
thanks
I have only done one other pool and we were able to bond the tracks and hide the bond lugs in embedded concrete.
In this case there is no way to hide them that I can see, and they'd be a hazard if they were on top(tripping hazard). Any ideas from people who have done more of these than I? Theoretically the rail sections should be self bonding but I am not sure the inspector will see it that way.
thanks