I have AC PV disconnected supplied from the line side of the building main service disconnect.
I know the building main service disconnect non solar install is required to be readily accessible. Does NEC 2014 require the AC PV disconnect above paragraph to be readily accessible?
I know the building main service disconnect non solar install is required to be readily accessible. Does NEC 2014 require the AC PV disconnect above paragraph to be readily accessible?