Accessibility - temp const pwr 120/240V sub panelboard

Isaiah

Senior Member
Location
Baton Rouge
Occupation
Electrical Inspector
On this construction site they have several temporary, sub-fed Panelboards with padlocks. I’m assuming the superintendent has the keys. But he’s usually in a trailer several hundred feet away. Is this a NEC accessibility violation?


Enviado desde mi iPhone utilizando Tapatalk
 
Top