blackmountain
Member
- Location
- Northern California
- Occupation
- General Contractor with electrical and plumbing classifications.
There shouldn't be any problem with punching a hole in the side of the meter main, right? I need to run some large feeders to the sub-panel to the left of it. I have to get three 3/0 wires from the panel on the right, to the one on the left, and using conduit bodies would be tight...even with 2". There are knockouts on the bottom that I can use, using the sides would be a lot cleaner (I think?)
Thanks
Thanks