I need to add the bottom feed 30 amp breaker but maybe I did used mine last spare slot for spa. I am not there at that house. So maybe I need to add a subpanel. The easy way to move the a/c 30 amp and spa 50 amp breaker in to a 125 amp subpanel. Also at that time is add a 40 amp breaker for 220v/EV charger plug in garage in case needed. Breaker for panel would be 125 amp.
The wire size would be 1 awg for copper or 1/0 for aluminum.

30+50+40=120 amp.

The question what governing not adding me more breaker in to 125 subpanel?
I am trying to get the min subpanel slot.
But I just hope that have one more spare slot then no need for subpanel. Also drywall is cheap, I will remove the drywall for solar run may just add a subpanel anyways.
Thanks for any help.
 

Dennis Alwon

Moderator
Staff member
Location
Chapel Hill, NC
Occupation
Retired Electrical Contractor
I am closing this thread, in accordance with the Forum Rules.
This site is designed for:
  • Contractors
  • Electricians
  • Engineers
  • Inspectors
  • Instructors
  • Other electrically related individuals
* This NEC Forum is for those in the electrical and related industries. Questions of a "How-To" nature by persons not involved in the electrical industry will be removed without notice.
If you feel this action to be in error, feel free to contact me via PM to explain.eminder to all members, if you see a questionable post, feel free to report it by clicking the
report-40b.png
button at the bottom left corner of the post.
 
Status
Not open for further replies.
Top