mikev86
Member
- Location
- Easton, MD
- Occupation
- Electrical Designer
Hello all! Working on a project in the US where we have an inverter to convert voltages for European equipment. Primary side of the inverter has (3) phase conductors and (1) grounding conductor. Secondary side of the inverter is also (3) phase conductors and (1) grounding conductor. We have a new piece of equipment (600Y/347V) coming that requires a neutral. A few questions below:
Mike
- Does a neutral need to be pulled from the source panelboard to the fusible safety switch and to the inverter?
- For the neutral between the inverter and the 600Y/347V panel:
- Can this neutral be pulled in a separate EMT conduit run adjacent to the phase conductors?
- Or will we need to replace the existing conduit with a larger conduit and run the neutral in the same conduit?
Mike