Curious of experiences in the field. Have a case where I'd 'like' to pull 7, 500mcm copper conductors (before ground) in a distance of about 25ft with two 90* ells. The conduit is 4" and already in place so I am trying to max it out best I can.
The fill is pushing it, not fun, but also not far to go. I guess examine from both a practical pov as well as AHJ because if AHJ won't accept, nothing else really matters, which backs it down to 400mcm. Because max ampacity is desired, copper is the target.
The fill is pushing it, not fun, but also not far to go. I guess examine from both a practical pov as well as AHJ because if AHJ won't accept, nothing else really matters, which backs it down to 400mcm. Because max ampacity is desired, copper is the target.