I can't quite remember the details on how do to figure out the minimum AIC rating for a load center for a small commercial unit (specifically a small church)
The existing load center seems to be marked with 10K and am planning to replace it with a HOMELINE load center. As far as I know the HOMELINE is 10K AIC.
Edward
The existing load center seems to be marked with 10K and am planning to replace it with a HOMELINE load center. As far as I know the HOMELINE is 10K AIC.
Edward