CharlieFer
Member
- Location
- Vallejo, California, USA
I have experience with the EZ Meter-Pak system from Square D that just all bolts together. What other allowable ways is there to design and install a 9 gang for a 9 unit building? Are they more cost-effective, or is the cost-savings just overcomplicating it and you'll waste more time on the field? I'm always looking to learn from smarter individuals, thanks guys