journeymensa
Member
Is there any code; and if so, Do I then need to mark transformer config. If your in the ceiling and opening the box your better have a clue. This is a hospital and we already color code and label crkts #'s. I think it is a spec that just didn't make it in the contract. This is the Patient care area! Critical and normal.
I'm at a lose
I'm at a lose