One of our local jurisdictions started requiring 200A service and sub panel (if any used), regardless of the size of the dwelling or what the calculation comes out to.
750sqft ADU slap a 200A service on it with full size 3/0 conductors.
A duplex and an ADU (400A) service with 600 kcmil service conductors.
Any of your jurisdictions requiring 200A regardless of the load calcs are?
TIA
750sqft ADU slap a 200A service on it with full size 3/0 conductors.
A duplex and an ADU (400A) service with 600 kcmil service conductors.
Any of your jurisdictions requiring 200A regardless of the load calcs are?
TIA
