Re: Are yoy paying
I am a ***** contractor and the 4th is not a a paid holiday. They get 6 others. If the 4th is work (emergency or planned shut down only) it is double time, no pyramiding of time even if it were a paid holiday it is still DT.
1.2 million dollar job at 12%. "if" you can get 12% out of that it is gross profit. by the time it sugars off it will be about 3 to 4% net.
A lot of head aches and stress for 4%. I know, I have been doing it for 30 yrs.
I am a ***** contractor and the 4th is not a a paid holiday. They get 6 others. If the 4th is work (emergency or planned shut down only) it is double time, no pyramiding of time even if it were a paid holiday it is still DT.
1.2 million dollar job at 12%. "if" you can get 12% out of that it is gross profit. by the time it sugars off it will be about 3 to 4% net.
A lot of head aches and stress for 4%. I know, I have been doing it for 30 yrs.