I'm requesting that the Electrical Contractor bring in a Grounded conductor for a 3ph 480 volt , Fire Pump Transfer Switch and Bond it to the enclosure ( Which is Marked for use as Service Equipment ) The Utility Supply is a 480/277 volt service. Is there a reason that the Electrical Engineer for the project is telling me that the Grounded conductor is not needed and therefore it is not required.
I'm I missing something , or is it just the Electrical Engineers way of thinking.
Thanks: Inspector Don