I think it would be a good idea to add a table to this article.
After recent experience with poco. they cost me MONEY, even though the Inspector approved 1 1/4" RGC 18" above roof for a 100 amp service. mast was within 6" of edge of roof. They think 2" RGC is the ultimate answer to all overhead services in S.C. "POCO rules!", they seem to disregard NEC adopted by state, and local AHJ
After recent experience with poco. they cost me MONEY, even though the Inspector approved 1 1/4" RGC 18" above roof for a 100 amp service. mast was within 6" of edge of roof. They think 2" RGC is the ultimate answer to all overhead services in S.C. "POCO rules!", they seem to disregard NEC adopted by state, and local AHJ