I thought I'd give my local solar power contractor (Texas Solar Power Company) a call and see if it would be cheaper to put in some sort of standby system before I ran off and had a Generac installed in May. It would seem that with tax rebates and whatnot that a PV battery backed system might well be competitive.
They want to run the wires from the array to the charge controller under the eaves in EMT. I'd prefer they were buried in RNC for a variety of reasons. He didn't know if that could be done, and the only thing article 690 mentions about wiring methods is that any DC wiring inside a house must be enclosed in a metal raceway.
(And I am going to suggest they join the forum whenever we get a chance to meet face-to-face.)
They want to run the wires from the array to the charge controller under the eaves in EMT. I'd prefer they were buried in RNC for a variety of reasons. He didn't know if that could be done, and the only thing article 690 mentions about wiring methods is that any DC wiring inside a house must be enclosed in a metal raceway.
(And I am going to suggest they join the forum whenever we get a chance to meet face-to-face.)