rszimm
Member
- Location
- Tucson, AZ
Here's the situation:  3 #1/0 plus 1 #6.  Going through a 2" underground PVC conduit with more bend than it should.  162' from end to end.  I've got a mule tape threaded through there now and a gallon of lube.  I've got 3 people plus myself to help in the pull.  Any advice?  What's the proper technique for attaching the end of the mule tape to the wires?
	
		
			
		
		
	
				
			 
				
 
 
		 
 
		