Help, help, help.. anyone know how can we know the available short circuit current at the point of service entrance? Per 1 RCNY §4000-01, for installing over 1000kva, we will need to show this information on plan for electrical review.
The total connected load is around 3000A, 208v, 3p. Can we use 200,000A or need to request from Con-Edison? Will con-edison provide this information or how long that would usually take to get this information since the job just started?
Thanksssssss.................
The total connected load is around 3000A, 208v, 3p. Can we use 200,000A or need to request from Con-Edison? Will con-edison provide this information or how long that would usually take to get this information since the job just started?
Thanksssssss.................