bjp_ne_elec
Senior Member
- Location
- Southern NH
Want to see where I'm at with my bid. The job essentially calls for running a HR in a dingy basement below a shop. The owners present service area blows breakers every other day. After looking at the loading of the service area, each work station should have a dedicated circuit.
So what I propose is running a 1" conduit from the panel in the front of the of the building (in the basement), to the back, and then popping up and hitting a series of receptacles. The conduit for most of the receptacles is run - but would have to run maybe two more, with a little 1/2" EMT and some boxes. How many hours to run the HR and pull say 8 new circuits the length - which, oh by the way, is 120'. I'm running the 1" to allow for expansion, and would most likely pull in 2-3 circits extra. Then when I go back, it's much shorter work to pop up a few more circuits.
Basement is all dirt and has pockets - that look like the might have ripped out some big old boilers.
How many hours, what would you charge? Like to hear both - as with the dollars, the rates might be slightly different. Running the conduit is a little bit challenging, as it's mostly 1/2 timbers, so I'll probably stick to the beams when I can find them.
Thanks
So what I propose is running a 1" conduit from the panel in the front of the of the building (in the basement), to the back, and then popping up and hitting a series of receptacles. The conduit for most of the receptacles is run - but would have to run maybe two more, with a little 1/2" EMT and some boxes. How many hours to run the HR and pull say 8 new circuits the length - which, oh by the way, is 120'. I'm running the 1" to allow for expansion, and would most likely pull in 2-3 circits extra. Then when I go back, it's much shorter work to pop up a few more circuits.
Basement is all dirt and has pockets - that look like the might have ripped out some big old boilers.
How many hours, what would you charge? Like to hear both - as with the dollars, the rates might be slightly different. Running the conduit is a little bit challenging, as it's mostly 1/2 timbers, so I'll probably stick to the beams when I can find them.
Thanks