sparkyjpb
Member
- Location
- S/E Michigan
I have a job to wire a different type of boat hoist (for me). It a 4 post with 2 motors, 1 on the dockside and 1 which would be on the port side of the boat. It is a 40' long dock with nothing on the port side, except water. My question is, what methods has anyone used to run from 1 piling to the other via the lake bed?