Can someone either answer my question or point me where and when in Art 250 bond bushings are required.
If you have LFMC with #1 conductors in-between two panels does both ends need a bond bushing or just one?
If you have LFMC with #1 conductors in-between two panels does both ends need a bond bushing or just one?