geochurchi
Senior Member
- Location
- Concord,NH
- Occupation
- Retired electrician
Good morning All, just want to verify the bond screw placement,when the ground is terminated in the meter socket the bond screw should be placed through the neutral block in the panel with the service disconnect,ground bar could then be installed for the bond wires.