POWER_PIG
Senior Member
If you have a service with multiple meters, for example a 4 store commercial bldg And say the service lateral comes from the utiliy's xfmr secondarys up into a 8 foot gutter then using gutter taps to branch off and feed the individual meters to the seperate shops. Where would you bond the grounded conductor? In the gutter?, all the meters?, or the all the disc's?
thanks,
Pig
thanks,
Pig