TOOL_5150
Senior Member
- Location
- bay area, ca
I failed an inspection, inspector said I need a bonding bushing on conduit @ subpanel.
Situation: 40A, 240v feeder to detatched structure, ran 3/4 rigid underground came right up into small surface mounted subpanel. Drove a rod and a GEC to panel. I also ran a EGC IN the 3/4 conduit. The panel has concentric knockouts and I just put a regular bushing on it. Who is right?
~Matt
Situation: 40A, 240v feeder to detatched structure, ran 3/4 rigid underground came right up into small surface mounted subpanel. Drove a rod and a GEC to panel. I also ran a EGC IN the 3/4 conduit. The panel has concentric knockouts and I just put a regular bushing on it. Who is right?
~Matt