I say that the correct way is to protect the building.
We really dont know how far away the generators are from the building. Could be 1/2 mile.
Are you suggesting that the ground be installed at the generator and not the building or do you suggest there is a problem that might develop by leaving the neutral connected to the frame?
We really dont know how far away the generators are from the building. Could be 1/2 mile.
Are you suggesting that the ground be installed at the generator and not the building or do you suggest there is a problem that might develop by leaving the neutral connected to the frame?