Lets say that you ran a GEC to the water pipe where it enters the house and also jumped the meter.
You then drive a pair of ground rods and run that bonding jumper from the rods to the water pipe.
Does it matter where you attach the jumper to the pipe? Are there any limitations? Or can it be done in any random spot? Under the kitchen sink, behind the toilet, etc?
You then drive a pair of ground rods and run that bonding jumper from the rods to the water pipe.
Does it matter where you attach the jumper to the pipe? Are there any limitations? Or can it be done in any random spot? Under the kitchen sink, behind the toilet, etc?