Pierre C Belarge
Senior Member
- Location
- Westchester County, New York
Picture a large MCC with 30 buckets, each with it's own control transformer.
Each would have be bonded to the EGC, the only difference between this and typical SDSs is the lack of GEC which serves no purpose inside a building.
There can be no 'circulating currents' with only one bond after a transformer.
So in essence they are bonding control transformers and not grounding them, even though they may be of line voltage?
and
This is because the conductors are not leaving the enclosure in which they originate?