allenwayne said:Jim there is no requirement to use pvc at all... ...Whithlacoochee...
You really shouldn't call names!
allenwayne said:Jim there is no requirement to use pvc at all... ...Whithlacoochee...
Code section?If I was inspecting your job, one thing that would ask you not to do is connect the electrode conductor to both meterbase and main disconnect.
don_resqcapt19 said:Code section?
don_resqcapt19 said:dnem said:If I was inspecting your job, one thing that would ask you not to do is connect the electrode conductor to both meterbase and main disconnect.
David,
Code section?
Don
don_resqcapt19 said:David,
If the same GEC is connected at two points I would agree, I thought that we were talking about multiple GECs from multiple electrodes connected to the grounded condcutor at different points.
Don