Dale001289
Senior Member
- Location
- Georgia
We have a 2000kVA, 15kV-480V, 3ph, 3W, delta-delta ungrounded dry type transformer that ties into a 480V load break disconnect immediately adjacent to the XFMR.
The XFMR GEC comes up thru the concrete mounting pad into XFMR housing. The pad has lots of rebar. So should the rebar be bonded to the XFMR GEC since the switch represents the service entrance? Or does it even matter since the system is ungrounded to begin with?
The XFMR GEC comes up thru the concrete mounting pad into XFMR housing. The pad has lots of rebar. So should the rebar be bonded to the XFMR GEC since the switch represents the service entrance? Or does it even matter since the system is ungrounded to begin with?