Ihave an installation consist of the following
Wood building ,use metal boxesfor recpt. and sw,ent.for raceway. i'm running one hot, one ntrl,and a grnd.
I'm connecting the grnd to recpt. grd screw ,recept. has the spring in the yoke. do I still to have to bond the metel box with a wire
and screw or the recpt. yoke will do the job
{flush mnt}
Wood building ,use metal boxesfor recpt. and sw,ent.for raceway. i'm running one hot, one ntrl,and a grnd.
I'm connecting the grnd to recpt. grd screw ,recept. has the spring in the yoke. do I still to have to bond the metel box with a wire
and screw or the recpt. yoke will do the job
{flush mnt}