SiddMartin
Senior Member
- Location
- PA
Have a 600A Main, Service disconnect, PVC to trough, then 1-300A disc, and 1- 400A disc coming outta trough. PVC between disc, and trough. On the 300A disc, load side is rigid going down into concrete floor to feed another building.
Inspector says that the rigid pipe has to be bonded w/ ground. He said to bond it to the trough or the disc that it is going into. (Could use a grounding locknut).
He said this is req. because it is "within arms reach" of the Main disc.
I questioned him b/c I did not consider the 300A disc. service equipment b/c it is after the main disc.
Is he correct?
Inspector says that the rigid pipe has to be bonded w/ ground. He said to bond it to the trough or the disc that it is going into. (Could use a grounding locknut).
He said this is req. because it is "within arms reach" of the Main disc.
I questioned him b/c I did not consider the 300A disc. service equipment b/c it is after the main disc.
Is he correct?