Per a recent inspection we have been requested to install a ground (I think he means bond)to a battery rack (steel frame). The rack contains (2) batteries (24VDC) supplying DC power to a newly installed SCADA panel. We cannot find a reference in the NEC for this requirement. Inspections has not to date provided reference to a code article either. Any ideas where or if this requirement exists in the NEC?