Hypothetical question: If I drilled the biggest hole allowable in a 2X4 and kept my cables 1 1/4" away from the plane of the surface of the 2 by, and I used "stack-its" to maintain the 1/4" spacing through the actual stud hole and used "stack-its" in the free space between studs (horizontally), I think I could put together as many as the hole spacing would allow without "bundling", since I would be maintaining spacing through the stud hole and the free space. Right or not?
This method might be a little more expensive at rough-in, but less drilling time might make up for the expense of the "stack-its".