jmargolis79
Member
- Location
- minneapolis
What's the box fill for 1/2 emt? Is this a code violation. Anybody know how it was done?
jmargolis79 said:What's the box fill for 1/2 emt? Is this a code violation. Anybody know how it was done?
How could you access the conductors, if you pulled through that mess? I say that this is a joke photo. :-?Jim W in Tampa said:Only reason for the why part is plans in future to change something.Never have i seen anything like it.
LarryFine said:If I had to venture a guess, it would be that someone intends to fool an inspector into believing that they installed a pull-box in a more-than-four-90's conduit run.
Jljohnson said:Maybe the box is for low volte wiring and they wanted to route high voltage through it for god only knows what reason. If so, they needed a barrier and the EMT provided it. I'm sure whatever it's purpode really is, there was a better way to accomplish the goal.