I work for a utility and noticed a panelboard today that was overhead fed, dual meter setup. Two conduits terminated in bottom of panel, 1 exiting the breaker compartment section, the other terminated in the metered (service side) section of the panel. Branch circuit conductors passed through metered section of panel into breaker compartment side, through a chase nipple on the barrier wall of section. This can't be legal can it? I've spent some time looking through NEC but can't find section. Any help would be appreciated