donnat
Member
- Location
- colorado springs, co 80903
TEMP POLE INSTALLED AND ENERGIZED. TEMP POLE AND WIRE NEW STRUCTURE ON SAME PERMIT.
RELEASED FROM PROJECT WITH 90% OF ROUGH IN COMPLETED. RELEASED FOR NO FAULT OF OUR OWN.
BUILDING DEPARTMENT ADVISED NO LONGER ON PROJECT. ALL ELECTRICAL PERMITS REMOVED FROM JOB.
PER BUILDING DEPARTMENT- TEMP POLE PERMIT REMOVED - POWER WILL BE TAKEN DOWN TOMORROW UNTIL NEW POLE
INSTALLED, PERMITTED AND INSPECTED. THAT WAS 2 MONTHS AGO.
GC IS ON THE BOARD OF DIRECTORS AT BUILDING DEPARTMENT.
IF POWER IS TAKEN LOOSE WITHOUT NEW POLE INSTALLED, IT WILL DESTROY THE GREENHOUSE AS THE PLASTIC IS INFLATED
CONTINUOUSLY WITH FANS. SO WE OFFERED THE GC 2 WEEKS TO FIND EC TO INSTALL NEW POLE. NO ACTION TAKEN BY GC.
OFFERED TO SELL POLE TO GC, RENT TO GC, NO ACTION.
IT IS VERY INSULTIVE TO BE RELEASED FROM A PROJECT BECAUSE YOU EXPECT TO GET PAID FOR WORK INSTALLED. THEN TO ALLOW YOUR
EQUIPMENT TO BE USED WITHOUT CONSENT, ADDS TO THE INSULT.
QUESTION:
POWER SHOULD NOT BE ALLOWED ON PROPERTY WITHOUT PERMIT AS JOB IS IN PROGRESS - SITE COULD BE DEEMED UNSAFE.
DO I HAVE THE RIGHT TO DEMAND POWER BE PULLED?
CIVIL OR CRIMINAL THEFT?
DO I GO AFTER THE BUILDING DEPARTMENT OR THE GC OR THE UTILITY COMPANY?
OR ALL THREE?
HOW WOULD YOU TACKLE THIS WITHOUT HAVING TO SPEND THOUSANDS?
THANKS
RELEASED FROM PROJECT WITH 90% OF ROUGH IN COMPLETED. RELEASED FOR NO FAULT OF OUR OWN.
BUILDING DEPARTMENT ADVISED NO LONGER ON PROJECT. ALL ELECTRICAL PERMITS REMOVED FROM JOB.
PER BUILDING DEPARTMENT- TEMP POLE PERMIT REMOVED - POWER WILL BE TAKEN DOWN TOMORROW UNTIL NEW POLE
INSTALLED, PERMITTED AND INSPECTED. THAT WAS 2 MONTHS AGO.
GC IS ON THE BOARD OF DIRECTORS AT BUILDING DEPARTMENT.
IF POWER IS TAKEN LOOSE WITHOUT NEW POLE INSTALLED, IT WILL DESTROY THE GREENHOUSE AS THE PLASTIC IS INFLATED
CONTINUOUSLY WITH FANS. SO WE OFFERED THE GC 2 WEEKS TO FIND EC TO INSTALL NEW POLE. NO ACTION TAKEN BY GC.
OFFERED TO SELL POLE TO GC, RENT TO GC, NO ACTION.
IT IS VERY INSULTIVE TO BE RELEASED FROM A PROJECT BECAUSE YOU EXPECT TO GET PAID FOR WORK INSTALLED. THEN TO ALLOW YOUR
EQUIPMENT TO BE USED WITHOUT CONSENT, ADDS TO THE INSULT.
QUESTION:
POWER SHOULD NOT BE ALLOWED ON PROPERTY WITHOUT PERMIT AS JOB IS IN PROGRESS - SITE COULD BE DEEMED UNSAFE.
DO I HAVE THE RIGHT TO DEMAND POWER BE PULLED?
CIVIL OR CRIMINAL THEFT?
DO I GO AFTER THE BUILDING DEPARTMENT OR THE GC OR THE UTILITY COMPANY?
OR ALL THREE?
HOW WOULD YOU TACKLE THIS WITHOUT HAVING TO SPEND THOUSANDS?
THANKS