I have a pole sign we are installing and the electrician put a brooks box where my foundation goes. I am being told to pour around the brooks box and encase it in concrete. It is a concrete brooks box and I am being told by the electrician that it is allowable by code. Just seems like there will be no drain field.
40 years of electrical signs and this is the first time I've been asked to do that. Besides using wirenuts for wet locations. Anything else I need to consider or do?