scwirenut
Senior Member
- Location
- Sumter, South Carolina
Im doing my first strip mall, its a metal building and im required to use one of the steel columns as part of my grounding system. I plan on exiting the back of my meter pack with 3/0 copper. my questions are: if the connection to the steel is not accessible does it have to be cadwelded? (such as the empty space behind the sheetrock wall). If so, I have never done a cadweld , could I bring the 3/0 up the interior wall into the accessible dropped ceiling and use a mechanical lug? also, regardless of connection location do I have to run the 3/0 in conduit?