bcl
Member
- Location
- Garden Ridge, TX
- Occupation
- Electrician (Owner/ Operator)
Yes, I included a provision in my bid that accounts for cost increases associated with the final isometric design. My original estimate included tap boxes, elbows, etc., but I didn't want to rely solely on my own interpretation of how things ought to be run.You definitely need an isometric drawing if you are changing direction or elevations or connecting to other equipment.
For a straight run I would think a simple drawing would suffice, but you need to include things like the tap box location and hanging parameters.