We have a Type W 5 conductor (L1, L2, L3, N & G) cable supplying 480 VAC that may be installed in conduit depending on the specific installation site. Some sites may use the cable to connect the to pieces of equipment if they are close and other sites may install the cable in conduit if the two pieces are located some distance apart.
Is there any additional derating that must be done to account for the installation in a conduit?
Is there any additional derating that must be done to account for the installation in a conduit?