A/A Fuel GTX
Senior Member
- Location
- WI & AZ
- Occupation
- Electrician
Has anyone ever used a cable tray system for running SER? I've got a job to run 8 lengths of SER ranging from 190' to 25' all originating from the same service through a basement and was thinking that a cable tray would be better than running individually and going with staples. It would sure be nice to be able to lay them in a tray.