no permits required.we are required to follow code but no one ever checks. That is why you see such poor work. Why follow the rules if no one ever checks is the attitude with alot of installers.Quite frankly with the pay scale the dish people offer trying to follow the rules cost the installer $$.We get a set pay per install we pay for the material and time. I have yet to see any provision at the panel or outside for my ground hookup. I usually have to try to dig for the bare copper or use one of those clamps.Alot of times its harder on the new installs becouse everything is nice and neat all in pvc pipe outside going right into the pannel.So finding a ground for us guys then looks ugly.If there is a code to provide a ground for us its not being followed here.