This is the subpanel in my own home (it was existing, I did not install it, and it was approved by the City). Now the question is: Do I take the time to fix it! Requires getting into the sheetrock to deal with the middle/feeder clamp. And is there enough slack to get those cables to individual clamps? Maybe with clamps listed for 3 or 4 cables and move them to an adjacent hole.