We are hoping to use the new Caddy Pyramid 300 equipment supports for several 4" pvc conduits installed on a membrane roof.

My question is, how in the world to ground this?

One seperate conduit just to carry an equipment ground and terminate to a mechanical lug at each support? We might have 30 of these critters.

Any thoughts would be appreciated.

http://www.erico.com/products/caddypyramid300.asp
 
Maybe I am not to bright but I have used many of these and never thought of bonding them.
 
I don't see those as likely to become energized. If they are you have a bigger issue with the pipe and insulation on the conductor.
 