Hello, I am new to the forum. I'm not a tech but a project mgr/estimator. I have been told that according to NEC code, a LV tech cannot install conduit more than 5'. If the conduit will be longer than 5' it must be installed by an electrician. The state of MN follows NEC, however, a state elec. inspector said he has never heard of this rule. Can anybody clarify? I spent some time online and couldn't find it. The next question would be, can we remove empty conduit? A customer is asking us. Thanks in advance.