SG-1
Senior Member
- Location
- Ware Shoals, South Carolina
Form A contacts are NO.
Form B contacts are NC.
You can effect a SPDT by using one of each and making one terminal from each common. Typical such arrangement would be, but not always, "beak before make"?which would be ideal.
Is the "operator" two contact capable?
If I have enough spares I can build a form "c". The contacts are all open together for less than 3 cycles.
Also there are two MOC switches from two breakers controlling the timer. I think you are suggesting grounding the wire when the contact changes. Through a resistor ?
Why not just place a pulldown resistor on the input of the timer ? I like what you are suggesting it is just a little more complicated to wire in at this point.